Skip to content
Shyenova

Supply Chain & Analytics

Logistics & Distribution

Freight rates are the last place to look for freight savings, and the first place everyone looks.

Logistics cost is mostly determined before a carrier is ever contacted. Order profiles, delivery frequency, minimum order quantities, packaging cube efficiency, dock scheduling and the promises the sales team makes all set the shape of the freight problem. Rate negotiation optimises within that shape. It cannot change it.

This is why sequential tenders show diminishing returns, each round extracts a little more from carriers who are already thin, while the structural drivers sit untouched. We work the structure first, because a lane redesigned to move full vehicles at a sensible frequency beats a lane re-tendered at three per cent less every time.

How the work runs

Four phases, and what comes out of each.

Durations are indicative and assume reasonable data availability. Where data is poor we say so in the first fortnight rather than modelling on sand.
01

2 weeks

Decompose the freight bill

We rebuild transport cost from invoice level into its true drivers: rate, distance, weight and cube utilisation, stop density, mode mix, accessorial charges and expedite premium. Accessorials alone are frequently a tenth of the bill and largely invisible because they arrive as a single aggregated line. Once decomposed, it is usually clear that the rate is not the problem.

Outputs

  • Freight cost decomposed by driver, lane and customer
  • Accessorial charge analysis with root causes
  • Vehicle and container utilisation profile
02

3–4 weeks

Fix the order and delivery profile

This is where the structural money is. Delivery frequency renegotiated against genuine customer need, minimum order quantities aligned to vehicle economics, order timing smoothed to flatten the weekly peak, and packaging redesigned for cube. These changes require commercial agreement, so we build the customer-level business case that makes the conversation possible.

Outputs

  • Delivery frequency and MOQ redesign by customer segment
  • Order profile smoothing plan with commercial impact
  • Packaging and cube efficiency opportunities quantified
03

4–6 weeks

Take the tender to market properly

Only now does rate negotiation make sense, because the volume being tendered is the volume you will actually ship in a shape carriers can price efficiently. We run a structured event with clean lane data, combinatorial bidding where it adds value, and evaluation on total cost including service reliability rather than headline rate.

Outputs

  • Tender pack with validated lane and volume data
  • Structured bid event with combinatorial evaluation
  • Award recommendation on total cost, not headline rate
04

4–6 weeks

Rebuild warehouse productivity

Warehouse improvement rarely needs automation to start. Slotting aligned to current velocity rather than last year's, pick path redesign, wave and batch logic, and labour standards that make a genuine day's work visible typically deliver double-digit productivity gains against existing infrastructure. Automation, if it is warranted, should be specified after this, never before.

Outputs

  • Velocity-based slotting redesign
  • Pick path and wave logic optimisation
  • Labour standards and productivity management framework

What good looks like

The ranges we design toward.

These are the improvement ranges these levers are known to produce where the underlying practice has not been examined recently. They are targets to test against your baseline, not promises.

10–18%

Freight cost

Typical reduction when structural drivers are addressed before tendering, not after.

12–25%

Warehouse productivity

Lines per hour improvement commonly available from slotting and process alone.

5–12 pts

Vehicle fill

Utilisation gain from order profile smoothing and MOQ alignment.

Deliverables

What you are left holding.

All of it handed over, documented, and with a session for whoever inherits it.
  1. 01Freight cost decomposition that survives challenge from your carriers
  2. 02Customer-level delivery profile redesign with commercial business case
  3. 03Run tender with award recommendation on total cost
  4. 04Warehouse slotting and process redesign with measured productivity gain
  5. 053PL scorecard rebuilt around outcomes your business actually feels

What an engagement looks like

A representative shape.

Illustrative. This is the shape of work in supply chain & analytics, not an account of a specific client. We do not publish named results, and we would be wary of a firm that publishes them without the client in the room.

12 weeks

  1. 01Situation

    A consumer goods manufacturer was opening a third distribution centre on the strength of a regional sales forecast, with freight cost per unit rising and no cost-to-serve view below channel level.

  2. 02What we did

    Reconstructed eighteen months of shipment data into a true origin–destination model, built cost-to-serve to customer level, and tested the proposed footprint against demand growth, rate shock and node-loss scenarios.

  3. 03Where it landed

    The third site turned out to be robust only under the most optimistic growth case. Redrawing catchments and re-tendering two lanes captured most of the projected saving without the capital, and the site decision was deferred rather than cancelled.

Where this connects

Rarely a self-contained problem.

These are the adjacencies that come up most often on this kind of work. Naming them is usually cheaper than discovering them halfway through.

Questions

The ones we get asked.

We just completed a tender. Is it too early to engage?

It is close to the ideal moment. The structural work (delivery frequency, order profiles, cube efficiency, dock scheduling) takes six to nine months to land and does not depend on the contract cycle. Doing it now means you arrive at the next tender with a fundamentally better freight problem to price, which is worth considerably more than the rate you just negotiated.

Should we automate our warehouse?

Possibly, but not yet. Automating a process before optimising it locks the inefficiency into capital equipment with a ten-year life. We would want to see slotting, pick paths and wave logic corrected first. The productivity gain from that is often enough to defer automation by two or three years, and if automation is still warranted the specification will be materially cheaper and better targeted.

Our 3PL scorecard is green but service feels bad. Why?

Almost always because the scorecard measures what is easy to measure and averages away what hurts. On-time delivery at ninety-six per cent monthly can conceal a systematic failure every Friday on one route serving your largest customer. We rebuild scorecards around the failure modes the business actually feels, weighted by customer consequence rather than volume.

Do you manage the tender or just design it?

Either. Most clients want us to design the event, prepare the data, evaluate bids and recommend the award, while their own team runs the supplier conversations. We are content to run the full event where capacity is short, but the carrier relationship should end up owned by your people.

Start a conversation

Talk to us about logistics & distribution.

Most useful first conversations are thirty minutes and involve no proposal. Describe the problem you are looking at and we will tell you honestly whether it is one we can help with.

Or write directly to hello@shyenova.com