Skip to content
Shyenova

Maritime Carbon

CII & Charter Party

A ship's CII rating is decided by the fixtures it takes. Most owners find out what they agreed to when the rating arrives.

The IMO's Carbon Intensity Indicator rates ships of 5,000 gross tonnage and above from A to E each year on their operational carbon intensity, which relates emissions to the cargo carried over the distance travelled. The required value tightens over time. A ship rated D for three consecutive years, or E for a single year, must set out a corrective action plan in its Ship Energy Efficiency Management Plan, Part III, showing how it will return to C or better.

The rating is driven by how the ship is employed: speed, waiting time, ballast legs and trade. Those are largely set by charterers, while the rating sits with the owner. That makes CII a commercial question as much as a technical one. Forecasting the rating effect of a fixture before it is agreed, and writing charter terms that reflect who controls the levers, prevents most of the problem.

How the work runs

Four phases, and what comes out of each.

Durations are indicative and assume reasonable data availability. Where data is poor we say so in the first fortnight rather than modelling on sand.
01

2–3 weeks

Forecast the rating per ship

Each ship's attained CII is forecast for the year from its voyages to date and its planned employment, using its own fuel model, and compared against the required value and rating boundaries. The forecast updates as fixtures are added.

Outputs

  • Rolling CII forecast per ship against rating boundaries
  • Ships at risk of D or E identified early
  • Drivers of each ship's rating decomposed
02

2–3 weeks

Price the fixture before it is fixed

A tool for chartering staff shows what a candidate fixture would do to the ship's rating and what it would cost to correct, so the trade-off is visible at the point of decision rather than at year end.

Outputs

  • Fixture-level CII impact estimate
  • Cost of correction alongside freight economics
  • Integration into the voyage estimate
03

1–2 weeks

Write the charter terms on evidence

We review existing charter parties for how CII responsibility is allocated and model what different allocations cost each party. The commercial position for new fixtures is then set on numbers rather than on a template.

Outputs

  • Review of CII terms in current charters
  • Cost of allocation options by party
  • Commercial position for new fixtures
04

2–3 weeks

Cost the corrective action plan

Where a corrective action plan is needed, each candidate measure is costed per unit of CII improvement and sequenced so the ship reaches C within the required period at least cost. The plan is written to be carried out, with owners and dates.

Outputs

  • Costed corrective measures ranked by effect
  • Corrective action plan for SEEMP Part III
  • Monitoring against the plan through the year

What good looks like

The ranges we design toward.

These are the improvement ranges these levers are known to produce where the underlying practice has not been examined recently. They are targets to test against your baseline, not promises.

A to E

Annual rating

Every ship of 5,000 GT and above is rated each year, with A the best.

D×3 or E×1

Corrective action trigger

Three consecutive D ratings, or one E, require a corrective action plan in SEEMP Part III.

Before fixing

When to forecast

The fixture decides most of the rating. After year end it can only be explained, not changed.

Deliverables

What you are left holding.

All of it handed over, documented, and with a session for whoever inherits it.
  1. 01Rolling CII forecast per ship with early warning of D and E risk
  2. 02Fixture-level CII impact tool for chartering staff
  3. 03Review and commercial position on CII charter terms
  4. 04Costed corrective action plans where needed
  5. 05Models handed over and run by your team

What an engagement looks like

A representative shape.

Illustrative. This is the shape of work in maritime carbon, not an account of a specific client. We do not publish named results, and we would be wary of a firm that publishes them without the client in the room.

12 weeks

  1. 01Situation

    A dry bulk operator with part of its fleet trading into Europe had its first EU ETS surrender approaching and no view of its FuelEU balance. Speed instructions were set commercially per voyage, bunkering was decided by price alone, and the CII rating for each ship was discovered after year end.

  2. 02What we did

    Fitted a speed and fuel model for each ship from its own reports, built one emissions dataset serving MRV, ETS, FuelEU and CII from the same fuel records, and priced allowance and FuelEU cost into the voyage evaluation used for fixtures, with a rolling CII forecast per ship.

  3. 03Where it landed

    Carbon cost appeared in the voyage estimate before fixing rather than in the accounts afterwards. Two ships heading for a D rating were identified early enough to act within the year. Allowance purchasing moved from a single deadline purchase to a schedule under a written mandate, and the models were handed to the operator's own team.

Questions

The ones we get asked.

Is a D rating a problem?

Not on its own, and not legally for the first two consecutive years. It is a warning that the third will trigger a corrective action plan, and that charterers and lenders may treat the ship differently. The value of forecasting is that a D can often be avoided within the year by changing how the ship is employed.

The charterer controls the speed. Why is CII our problem?

Because the rating attaches to the ship and therefore to the owner. That mismatch is exactly why charter terms matter. Terms that allocate responsibility to whoever controls the levers, backed by a forecast both parties can see, prevent most disputes.

Can you write our SEEMP?

We can write the corrective action plan content and cost the measures in it. Verification of the SEEMP and the rating sits with the flag administration or the organisation acting for it, and we have no role there.

Start a conversation

Talk to us about cii & charter party.

Most useful first conversations are thirty minutes and involve no proposal. Describe the problem you are looking at and we will tell you honestly whether it is one we can help with.

Or write directly to hello@shyenova.com